Installation Requirements:
1.The minimum installation space for a P2 Laboratory is 6 .0 * 4.2 * 3.4 m (L* W * H).
2.The floor should be flat with a variance of less than 5mm/2m .
3.Preliminary site preparations must include :
1) Wiring for 220 V/ 110V, 50Hz, 20KW.
2) Plumbing connections for water and drains.
3) Connections for network and telephone wiring.